Post Tagged with: "Net Zero Build"

by / on September 16, 2013 at 10:38 am

Sticks and Stones Video presents Zero Net design! July 30, 2013

A great new video from our Vimeo Page at Sticks and Stones Video presented by Sticks n’ Stones – Videographer – Midori NetZero July 30,2013 from Sticks and Stones Productions on Vimeo. In this video we watch Master Timber Framer Eric fashioning timbers for addition to the project home. With […]

Read more ›
by / on September 3, 2013 at 10:53 am

NetZeroBuild wall construction – July 31, 2013

Preparing for the footers – July end and August Beginning – 2013 Start of Walls from Sticks and Stones Productions on Vimeo. We are cruising back to the archives with Sticks and Stones media. Thanks to Midori for getting these to us. In the video Lou Fenninger, owner and CEO […]

Read more ›
by / on August 8, 2013 at 2:07 pm

Bobcat working overtime at netzerobuild.ca

NETZEROBUILD.ca AUGUST UPDATE STICKS AND STONES PRODUCTIONS VIMEO FILM BY MIDORI – AUGUST 7-2013 NetZero July23 from Sticks and Stones Productions on Vimeo. Moving boulders is just one of the pesky nuances involved in building a house in the Haliburton Highlands. Take a look at this great video shot by […]

Read more ›
by / on July 27, 2013 at 2:37 pm

Foundation excavation completed – NetZeroBuild update

Progress Update: July 24-2013 NetZeroBuild Progress Report 1.We have all the main beams cut and ready to install. 2. We did the excavation today and it went perfect. 3. The first few support trees have had the white oak inserts installed So we are off to the races ..next is: […]

Read more ›
by / on July 13, 2013 at 10:18 am

Net Zero Build moves into big timber prep stage

Master timber framer Eric using cement pad for log shaping In the video above we watch Eric doing some of the delicate work on the big timbers. We’ll be posting some other videos as we move into the crucial building stage. Please follow us on twitter. twitter.com/NetZeroBuild

Read more ›
by / on July 7, 2013 at 5:37 pm

Pouring the cement pad – June 29-13

We had a full crew and three loads of cement to place onto the form on the NetZeroBuild.ca site last week. It will become a studio eventually. Pottery anyone? Marianne can’t wait. Or so I’m told. But for the duration of the build itself? The pad will act as a […]

Read more ›
by / on June 7, 2013 at 1:39 pm

Net Zero Build – June 5 update… Video

JUNE 5 2013 VIDEO UPDATE The weather took a strange turn here in the Highlands this week. Frost warning followed by rain and below average temperatures have muddied up the site once again. But CEO Lou Fenninger is still out everyday with his chain saw and bobcat (skidder) moving timber […]

Read more ›
by / on May 9, 2013 at 10:23 am

Drawings and site plans May 5, 2013

Site Plan Drawings Eagle Lake, Ontario –┬áMay 6 – 2013 Lou Fenninger is in the process of getting building approvals for the new home and once that’s completed the foundation process will begin. In this post we include three drawings that will give you a general idea about the general […]

Read more ›